897 B
897 B
Maintenance log
Newest entries at the bottom.
- 2026-09-01: Escape pod batteries charged.
- 2026-09-02: Antenna realigned.
- 2026-09-02: Fire extinguishers checked.
- 2026-09-04: Gyroscopes recalibrated.
- 2026-09-04: Escape pod batteries charged.
- 2026-09-04: Oxygen scrubbers replaced.
- 2026-09-05: Water recycling filters replaced.
- 2026-09-05: Antenna realigned.
- 2026-09-06: Fuel lines checked for leaks.
- 2026-09-07: Solar panels cleaned.
- 2026-09-07: Coffee machine descaled.
- 2026-09-07: Hull inspection, no leaks.
- 2026-09-09: Antenna realigned.
- 2026-09-09: Solar panels cleaned.
- 2026-09-10: Escape pod batteries charged.
- 2026-09-10: Debugging duck accounted for.
- 2026-09-11: Comms backup tested.
- 2026-09-14: Water recycling filters replaced.
- 2026-09-15: Airlock seals checked.
- 2026-09-15: Water recycling filters replaced.
- 2026-09-16: Coffee machine descaled.